East Campus Parking Lot

The razing of Strawn and Carson Cottages allows for improvements to the east side of campus, including additional parking and lighting and safer pedestrian walkways. 

The project is expected to be concluded by the first week of the semester. 

Updates
  • Fencing will be installed around the gravel lot and the Chapel lot sometime in the next two weeks to ensure the site is ready for construction to begin on May 19. Both lots will still be available for parking.
  • Beginning May 19, the gravel lot and the Chapel lot will be closed. All cars must be moved from that lot by noon on Sunday, May 18 or risk being towed.
  • The lot closures will prevent through-access to Blazer Hall from the the southeast side of campus; detour signs will be in place, directing you to use Hodson Drive to Blazer Trail. 